Update Terakhir : | |||||
---|---|---|---|---|---|
STOK SPAREPART PMT-DOI | |||||
No | Uraian Mesin / Instalasi | Satuan | Stok Minimal Persediaan Barang Jadi | Stok Saat Ini Persediaan Barang Jadi | |
Jumlah | Jumlah | ||||
1 | Lori Rebusan (Kapasitas @ 2.500 kg TBS) | Unit | 50 | 3 | |
Roda Lori c/w As | Set | 100 | 105 | ||
Bushing | Pcs | 200 | 183 | ||
2 | Timba - Timba Buah Masak (Fruit Elevator) | Unit | 1 | 0 | |
3 | Bantingan (Thresher) | ||||
As Bantingan | Set | 2 | 1 | ||
Tromol Bantingan | Set | 2 | 0 | ||
4 | CBC (Cake Breaker Conveyor) | ||||
Bodi CBC | Segmen | 12 | 8 | ||
Gantungan CBC | Set | 20 | 7 | ||
Pedal - Pedal CBC c/w As | Segmen | 12 | 0 | ||
5 | Polishing Drum | ||||
Bodi Polishing Drum | Set | 1 | 1 | ||
Roll Bodi Polishing Drum | Set | 2 | 1 | ||
Roll Bawah Polishing Drum | Set | 8 | 14 | ||
Roda Gigi Polishing Drum | Buah | 2 | 1 | ||
6 | Hydrocyclone | ||||
Dewatering Drum | Buah | 10 | 5 | ||
Bottom Cone Inti | Buah | 12 | 19 | ||
Bottom Cone Cangkang | Buah | 12 | 26 | ||
Vortex Finder | Buah | 6 | 2 | ||
Feed Housing | Buah | 6 | 13 | ||
Body Cyclone | Buah | 6 | 16 | ||
Separating Cyclone | Buah | 6 | 16 | ||
Box Control | Buah | 6 | 4 |